Reconstruction and expansion project for a family house in Chernomorets

  • Reconstruction and expansion project for a family house in Chernomorets - 1
  • Reconstruction and expansion project for a family house in Chernomorets - 2
  • Reconstruction and expansion project for a family house in Chernomorets - 3
  • Reconstruction and expansion project for a family house in Chernomorets - 4
  • Reconstruction and expansion project for a family house in Chernomorets - 5
  • Reconstruction and expansion project for a family house in Chernomorets - 6
  • Reconstruction and expansion project for a family house in Chernomorets - 7
  • Reconstruction and expansion project for a family house in Chernomorets (1)
  • Reconstruction and expansion project for a family house in Chernomorets (2)
  • Reconstruction and expansion project for a family house in Chernomorets (3)
  • Reconstruction and expansion project for a family house in Chernomorets (4)
  • Reconstruction and expansion project for a family house in Chernomorets (5)
  • Reconstruction and expansion project for a family house in Chernomorets (6)
  • Reconstruction and expansion project for a family house in Chernomorets (7)

Project description:

 

Situational decision approaches:

Allotted for building 535m2 property is bordered to the southeast and southwest with other

properties and the northwest and northeast of streets. The property has a building on two floors,

to which will be built the new building. The wooden roof of the existing building will be removed,

and replaced by a flat roof. All the requirements for heights and distances are fulfilled.

 

Floor plan:

-the elevation - 0.00: grocery store, warehouses, staff room

-the elevation +3.40: two one-bedroom apartments consisting of a bedroom and living room

(kitchen, dining area, sofa and TV module).

-the elevation +6.20: one bedroom apartment consisting of two bedrooms and a day space vo

(kitchen, sofa and TV module)

Traditional construction is solid concrete with insulation provided. The roof is flat.

 

Materials for surface treatment and shaping of facades:

White and colored mineral plaster, PVC windows, glass railing tiling , plates sheating - HPL panels,

trellis.

Seeking an architectural design in accordance with the surrounding natural and built environment.

 

Developed a comprehensive detailed design for reconstruction, extension and upgrade of an

existing building under the guidance of architects - Simeonov

Architectural Visualization - architect Ivaylo Simeonov 

 

  • Designer:
    architect Tsvetan Simeonov
    architect Ivaylo Simeonov


  • Year:
    2014

  • Phase:
    Technical project

  • Location:


  • Default Parameters:
    Total Building Area = 642м2

Please read our Privacy Policy. Our website uses cookies