Situational solution, approaches:
The land allocated for construction is 5913m2 and is bordered on the east by an existing road, and on the north, south and west by other land properties. The main approach to the building is from the east. Parking is provided within the property.
Contents:
- at elevation 0.00 there are: sales hall, coffee-espresso, warehouse, electrical panel room, toilet. nodes, boiler room and changing rooms.
- at elevation +3.50 there are: sales hall, warehouse, bathroom. nodes and changing rooms
- at elevation +7.00 there are: offices, a meeting room and a bathroom. knots
Materials for surface treatment and shaping of the facades:
The facades are treated with mineral plasters, structural glazing and aluminum joinery.
The entire architectural project of the building was prepared by the Vertikali architectural studio team, under the direction of architect Tsv. Simeonov.